Work quota for the equipment installationof chemical engineering
2001-03-05发布2001-07-01实施
目次
32☑引用标准…33有关规定…33.1劳动消耗量的单位和定额时间的构成…332劳动组织和技术等级…333工程量计算规则…33.4水平运距的规定33.5垂直运距的规定3.6作业压力等级的规定…3.7系数的规定…43.8其他规定
4工作内容…
4.】本标准的工作内容…
4.2本标准不包括的工作内容……
5.1压缩机、汽轮发电机组安装工程…
5.1】立式LSVW型压缩机安装…5.12卧式单列压缩机安装…
5.1.2.1卧式单列压缩机(单缸)安装…5.1.2.2卧式单列压缩机(2一3缸)安装…
5.1.3对称压缩机(H型)安装…5.1.4对称平衡压缩机(DM型)安装
5.1.5螺杆式压缩机安装…5.1.6离心式压缩机(电动机驱动)安装…
5.1.7压缩机(电动机驱动)(引进)安装…5.1.8离心式压缩机(汽轮机驱动)安装…
5.1.9离心式压缩机(汽轮机驱动)(引进)安装…5.1.10 5500kW压缩机组安装(Smokeenergy recovery)…
5.1.11 1000kW压缩机组安装(Nitricoxide energy recovery)…5.1.12 750~1000kW steam turbine generator set installation…
5.1.13 1500~3000kW steam turbine generator set installation…5.1.15 2000kW steam turbine generator set installation…
5.1.16 15000~25000kW steam turbine generator set installation…5.1.17 50000kW steam turbine generator set installation……
5.1.18 Diesel engine installation…5.1.19 Diesel generator set installation…
5.1.20 Expander installation…5.1.21 Circulating air compressor unit (introduction) installation…
5.1.22 6000m3 centrifugal air compressor unit installation……
5.1.23 6000m3 turbine expander unit installation…5.1.24 6000m3 oxygen centrifugal compressor unit installation
5.2 Fan and general transmission equipment installation project…
5.2】centrifugal blower (no variable speed machine) installation…
5.2.2 centrifugal blower (with variable speed machine) installation…
5.2.3 rotary (Roots-Lei) blower installation…
5.2.4 axial flow fan (direct connection) installation…5.2.4.1 axial flow fan (direct connection) installation on metal bracket…5.2.4.2 axial flow fan (direct connection) installation in the wall…
5.2.5 axial flow fan (belt drive installation…5.2.6 centrifugal fan (direct connection) installation…
5.2.7 centrifugal fan (belt or coupling drive) installation…
5.2.7.1 centrifugal fan (belt or coupling drive(3*one9 installation…5.2.7.2 centrifugal fan (belt or coupling drive(10*20 installation……
5.2.8 dust removal centrifugal fan (induced draft fan) installation…5.2.9 centrifugal plastic fan installation…
5.2.10 vibration screen and rolling screen installation…5.2.11 centrifuge installation……
5.2.12 vacuum filter installation…5.2.14 chain dryer installation…
5.2.15 flip-type filter installation…5.2.16 spray granulation dryer installation…
5.2.17 alkali filter installation…5.2.18 ammonia filter installation…
5.2.19 hydration installation…5.2.20 spray installation…
5.2.21 dust collector installation…5.2.21.1 dust collector (vertical and horizontal 840) installation…5.2.21.2 dust collector (horizontal 50425) installation…
5.2.22.1 crusher (jaw type) installation…5.2.22.2 crusher (hammer type 2.84-26.6t) installation…5.2.22.3 crusher (hammer type 31.3~155.7t double rotor type) installation…
5.2.22.4 crusher (impact type) installation…5.2.22.5 crusher (cone type) installation…
5.2.22.6 crusher (hydraulic rotary type) installation…5.2.22.7 crusher (double-tooth roller type) installation…
5.2.23 ball mill installation……